| Misinterpreting Design Intent |
Incorrect connection types or sizes |
Coordination with engineers, RFI workflows, design reviews |
| Missing Weld/Bolt/Geometry Details |
Compromised connection strength and integrity |
QA process, AISC/IS detailing, software validation |
| Ignoring Fabrication & Field Constraints |
Installation issues, on-site clashes |
3D modeling (Tekla, AutoCAD), input from fabricators & erectors |
| Using Outdated Standards |
Design/code non-compliance |
Latest AISC/IS training, versioned templates, compliance checks |
| Dimensional Inaccuracies |
Field fixes, misaligned members |
Field-verified dimensions, clash checks, digital QA |
| Incomplete Documentation (Coating, Prep, etc.) |
Fabrication delays, coating miscommunication |
Detailed notes on surface prep, finish, and coating specs |
| Incorrect Material Specification |
Structural risk, code non-compliance |
Verified steel grades, seismic/environmental spec checks |
| Shop vs. Erection Drawing Discrepancies |
Field disputes, delays, rework |
Unified reviews, multi-team coordination |